So what s there in your strategy book.
Tile shower curb or floor first.
This diy video how to tile shower curb step by step shows how to tile shower curb properly step by step in details.
Some showers have grout lines that carry up from the floor over the curb across the shower floor and then up the walls.
Hire a contractor if you have any doubts about your abilities.
Ensure the shower floor has a per foot pre slope slope before application of any materials.
At first survey the curb and the tiles you brought to position on that surface.
Install pea gravel or spacers around the drain and weep holes to enable drainage.
Mark the curb accordingly.
Don t just start putting tiles at random or such stuff.
What is the main reasons why you should do the floor first.
A wood 2 4 horizontally to the floor is actually 1 1 2 inches tall.
And that can t happen if the wall tiles are already installed.
Wood shower curb should be fastened to floor and to each other.
At first thought from the water leak perspective doing the floor right up to the outer shower curb first wouldn t allow water to seap through the grout at that outer seam.
Mosaic kitchen tiles mosaic wall tiles ceramic floor tiles ceramic wall tiles wood floor tiles porcelain floor tiles kitchen floor tiles kitchen wall tiles bathroom floor tiles bathroom wall tiles outdoor floor tiles hexagon wall tiles more.
In our project we set the tile for the wall opposite the shower door first.
Asthetically i can t really see any difference.
Others have separate floors walls and curbs.
Use a chicken wire for floating cement over shower curb.
Proper planning for the work can save you hundreds of bucks and immense work hour.
Use a wooden straight edge to level finished cement over shower curb.
It seems if the tile from the curb came last then water would be stopped a little better.
It include design considerations measur.